ROSADA Outlet-centre in Roosendaal
ROSADA Outletcentre in Roosendaal The erection of the steelstructures ia almost finished. The last buildings (a parking deck and a tower) will be installed in May 2006.
Then approximatly 1.200 tonnes of steel well be erected at the location "de Stok" in Roosendaal. The installation of the profiled roofplates will be finished 4 weeks later.
18 maart 2006 |