Project:

BC-Link Schiphol Airport

Projectomschrijving

On behalf of Schiphol Airport / Heijmans, De Kok Staalbouw was allowed to realize the new connection between the current B and C pier. The new bridge, which consists of eight modules in total, forms a 272-metres connection between the current B and C pier. We have installed the prefab modules, each weighing approx. 250 tonnes, in only “8 night shifts’’. De Kok Staalbouw carried out the engineering, steel construction, roof and wall cladding, transport and installation of the modules.

Facts and figures

Client

Schiphol Airport / Heijmans

Location

Schiphol, Amsterdam, The Netherlands

Delivery

May 2020