Project:

Shipyard Oceanco

Projectomschrijving

For Cordeel Nederland BV., the Kok Staalbouw was able to realize the steel construction and roof cladding for the upgrade of the Oceanco construction facilities at its shipyard in Alblasserdam. The hall has a length of 154 meters, a height of 30 meters and a width of 41 meters. Only the two “side aisles” of the existing construction hall were preserved. By constructing “the roof structure’’  outside the roof surface, the Kok Staalbouw was able to maximize the additional space under the roof.

 

Facts and figures

Client

Cordeel Nederland B.V.

Location

Alblasserdam, Netherlands

Delivery

May 2020