Project:
Unique transVORMation
Project description
Commissioned by VORM Holding, The Kok Staalbouw has realized an entire additional floor on their existing office building “De Nieuwe Maaskant”. This 4th floor was transported in its entirety over the water to the Rotterdam Schiehaven by tugboat. Subsequently, this 700-ton floor was mounted on the existing office building. The 800 m2 glass and steel construction rests on four columns that support the weight. As a result, the enormous construction seems to “float” above the building.
We are proud that we have been able to take care of this special steel construction, engineering, transport and lifting for VORM Holding.
Facts and figures
- 700 Tonnes weighing floor
- 800 m² construction
Client
VORM Holding
Location
Schiehaven, Rotterdam, The Netherlands
Delivery
June 2020