The Conrad building is a bustling city campus that accommodates various Amsterdam University of Applied Sciences (HvA) faculties and programmes of study.
De Kok Staalbouw supplied the 500-tonne main steel framework of this impressive complex – including floors, atrium roof, lift shafts, staircase, and canopy structures – which includes both low- and high-rise buildings and is linked to the Theo Thijssen building via the atrium roof.
Visser & Smit bouw BV, Unica & Bouwbedrijf M.J. de Nijs en Zonen B.V.
Amsterdam, Netherlands
April, 2022
Deze website gebruikt cookies. Door gebruik te maken van deze website, geef je aan akkoord te zijn met het gebruik van cookies. Lees meer