‘De Bolder’, Mammoet van Seumeren's boulder-shaped head office, was built in record time under climate-controlled conditions, in the Grootint production hall in Zwijndrecht. In total, De Kok Staalbouw laid 3,750 m² of ComFlor 100 decking.

Despite a maximum span of 5.7 metres, a thin floor (170 mm) was achieved, with a weight of just 280 kg/m². Then the whole thing was shipped from Zwijndrecht to Schiedam, which required skill and nerves of steel. In total, the move took three days.

This construction method demonstrates that ‘plug and play’ is also possible for complete office buildings, and that extremely quick construction is possible, even at hard-to-reach building sites, on the water.

FACTS AND FIGURES

  • 3,750 m2 ComFlor 100 composite (steel/concrete) structural floors
  • Design engineering firm: Broersma Engineering, The Hague
  • References: Building with Steel 163 & 168
  • Awards: Winner of the Steel Design Award 2002

Client

Mammoet van Seumeren

Location

Zwijndrecht / Schiedam, Netherlands

Delivery

2001

Project in focus

De Bolder - Projecten - De Kok Staal
De Bolder - Projecten - De Kok StaalDe Bolder - Projecten - De Kok Staal
De Bolder - Projecten - De Kok StaalDe Bolder - Projecten - De Kok Staal

Deze website maakt gebruik van cookies

Deze website gebruikt cookies. Door gebruik te maken van deze website, geef je aan akkoord te zijn met het gebruik van cookies. Lees meer

Sluiten