Footbridge Air Traffice Control the Netherlands (LVNL Amsterdam)

PROJECT DESCRIPTION 

For the expansion of the building complex of Air Traffic Control the Netherlands at Schiphol-Oost, De Kok Staalbouw took on the realization of the connecting bridge.

The connecting bridge, with a futuristic look, connects the new training centre with the existing building. We were involved in its design as part of a construction team.

The steel structure was delivered in two 25-metre sections and transported to Amsterdam on a pontoon. The two parts were then joined together on location to form a single unit. The entire bridge was turned and raised into position in one day. The essential part of the bridge is the steel column. The ‘tree structure’, including the four branches, consists entirely of steel laminations.

Client

Octatube Space Structures B.V.

Location

Schiphol-East, Netherlands

Delivery

September 2019

Project in focus

Loopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok StaalLoopbrug LVNL Amsterdam - Projecten - De Kok Staal

Deze website maakt gebruik van cookies

Deze website gebruikt cookies. Door gebruik te maken van deze website, geef je aan akkoord te zijn met het gebruik van cookies. Lees meer

Sluiten